Cooling Tower Test

Cooling tower test

Something is wrong with your cooling tower? Let us find out what.

Most owners do not know what is happening inside their cooling tower. We check it, take all the data, review it, and make you a report: what is happening, and how we solve it.

  • Airflow test, ASME PTC-30
  • Performance test, ASME PTC-30
  • Noise level
  • Visual inspection
  • Hot air recirculation measurement
  • Vibration check
  • Thermal analysis
Engineer checking cooling system equipment
ASMEStandard method
7 checksAirflow to thermal
On siteMeasured at your plant
Full reportWhat happened and how we solve it

Sound familiar?

Signs your cooling tower needs a check

If you see any of these, there is a reason, and it is usually fixable.

01

The power bill keeps going up

Fans and pumps may be using far more electricity than they need to.

02

The water is not cold enough

Your process runs hot, output drops, and nobody can say why.

03

You buy more and more makeup water

Water escapes through the fan stack, and you pay to treat or buy every drop.

04

Rust is spreading around the factory

Drifting droplets land on equipment, roofs and pipes.

05

The fan or gearbox is noisy or shaking

Small vibration problems grow into big breakdowns.

06

You are not sure what the tower really delivers

Most owners have never measured it.

How it works

From “something is wrong” to a clear answer

Four simple steps, and you stay informed all the way.

  1. 1

    We visit and check

    Our engineers come to your plant and inspect the tower and the system around it.

  2. 2

    We take all the data

    Airflow, performance, noise, vibration, hot air recirculation and temperatures, measured to ASME method.

  3. 3

    We review it

    We study the data and find what is really happening to your cooling tower, and why.

  4. 4

    You get a report

    We explain it in plain language, and show you how we solve it.

Your report

You do not just get numbers. You get answers.

Every cooling tower test ends with a report written for the people who make the decisions.

  • What is happening to your cooling tower
  • Why it is happening
  • What it costs you if nothing changes
  • How we solve it, with clear options
  • What the solution can save you
Cooling tower test on siteEngineer taking measurements

Why talk to us

A cooling tower test that leads somewhere

We look at the whole system

Not only the tower: the fans, pumps, pipes and water use too.

Upgrade without changing the gearbox and motor

Often we can upgrade the tower and keep the equipment you already have, which keeps your cost down.

One partner for the fix

Fan blades, fill, drift eliminators, gearboxes, drive shafts and pumps from trusted principals, plus our own service team.

Real data, not guesses

You decide with measured figures from your own plant.

Do not wait for something to break

Message us today and tell us what is going on with your cooling tower. We will tell you how we can check it and what you can learn from it.